CONSULTANCY PROJECT GUIDELINES

  • Short term projects to solve specific problems of industry, lasting 1-2 years
  • Expected results at the end of the project are jointly defined at the beginning
  • Cost of a consultancy project usually depends on the nature of the problem to be solved
  • ‘Routine testing’ is not encouraged
Translate ยป
Skip to content